Completed Projects

 

Seth Bhuramal Gangwal High School Hasteda

  • Sharbat Devi E – LEARNING HALL : approx. 1000 sq ft (RCC STRUCTURES)
  • Two Class Rooms: 1000 sqft (RCC STRUCTURES)
  • Repair and maintenance of all Class Rooms
  • Paint of all Class Rooms
  • Polish of all fixed wooden structure
  • 150 new table and chairs
  • Inverter for Sharbat Devi E-learning hall and principal room
  • Development of Prabhu Lal Agri Division
  • Development of playground and attract small students to enrol.
  • Repair and painting of entire building measuring about 10000 sqft.
  • Water supply
  • 20 big benches and tables.
  • 55′ LED TV for E-learning Hall
  • interlocking tiles on entire ground measuring 10000 sqft
  • Student safety Railing on 1st floor measuring about 1000 sqft
  • Steel shedding of entire 1st floor of about 1500 sqft
  • Outdoor equipments for playground
  • Small ramp made for physically challenged kids.
  • A new gate number three constructed for the entrance of upcoming aanganbari.

Location: